|
100,000 Pounds Per Hour Nebraska Boiler
- Only used as a back-up boiler & cycled for maintenance purposes 10-20 hours per month.
- Unit commissioned 1995 and decommissioned into storage 2005
- The boiler comes complete with burner, #2 oil fuel train, header valve, pressure and level operating and safety controls, deaerator and chemical feed skid.
- The boiler is NOx compliant ready to fire natural gas and if required could be modified to fire #6.
- Better than excellent condition
Design Data (Click Here) Additional Images of Boiler
Sold as is & where is. No warranty offered or implied.
|